B6
HSE + EA remediation guidance
Remediation Materials
Lime stabilisation binders, soil treatment, contamination capping materials.
Failure consequence: Remediation failure £50–£300k/site
Materials
Certified products
No materials seeded for B6 yet.
Packages
Brownfield deal packages
Tier 1
Brownfield Gas Protection Pack
£200
48h turnaround
- Contamination class to membrane mapping
- Specific certified product
- BBA certificate reference
- Supplier contact (Delta / Proctor / ITP)
- CIRIA C735 compliance summary
Tier 2
Full Brownfield Materials Schedule
£450
48h turnaround
- B1 + B2 + B3 + B4 materials covered
- NHBC LQ03 ready documentation
- Multiple supplier comparisons
- Installation sequence notes
- 1 revision included
Tier 3
Brownfield Premium with Remediation
£700
72h turnaround
- All B1-B6 categories
- Remediation material specification
- Contaminated fill classification advice
- Specialist contractor shortlist
- 2 revisions included